Fisher River Cree Nation was in need of a road upgrade to the existing community road situated west of PR 224, known as West Road. Upgrade works were completed on both sides of the West Road bridge that crosses the Fisher River. The 2.6 km stretch of West Road was re-graded; geotextile and granular material
Wabaseemoong Independent Nations is undertaking the development of a new residential subdivision. JRCC was originally retained for the Feasibility Study of the entire 117-lot development and was subsequently retained to design the 62-lot Phase One development. The design included water distribution piping, sewer collection piping, residential roads and drainage, pedestrian walkways, driveways, and lot grading.
As part of the City of Selkirk’s Downtown Renewal Strategy, JRCC provided engineering design and construction administration services for the reconstruction of Eveline Street between Eaton Avenue and Queen Avenue. The project transformed a key downtown corridor through the renewal of underground infrastructure, roadway reconstruction, drainage upgrades, and the addition of accessible active transportation facilities.
JRCC provided planning, engineering design, and construction administration services for Phase 1 of the Amisk West Subdivision, a new urban-style residential development designed to address housing shortages and support long-term growth within Opaskwayak Cree Nation. The project included 95 single-family lots, three multi-family apartment complexes, paved roads, sidewalks, street lighting, water and sewer services, and
Nisichawayasihk Cree Nation, located 65 km west of Thompson, Manitoba, developed a new residential subdivision along Moody Drive to support community growth. The project required a servicing approach that accounted for the community’s remote northern location and the need for reliable, low‑maintenance infrastructure. JRCC was engaged to design the full municipal servicing package, including water
Sandy Lake First Nation required 40 residential lots to accommodate delivery of 17 modular homes in 2023, and 23 modular homes in 2024. The residential lots are being developed over two phases based on the delivery schedule for the modular homes. JRCC was retained to provide engineering design services for the 40 residential lots, which
The CPS included conceptual planning for several new subdivisions to address the community’s significant housing shortfall, and considered the community’s need for improved water, sewer and road infrastructure in existing and proposed residential areas.